Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
Our collaboration with TFBC originally began as an overall master planning project. After being selected through an invitation only design competition, we assisted the Church in assessing their then current fa- cilities versus anticipated needs in both the short and long terms. Conse- quently, a compre- hensive plan of expan- sions and renovations was generated that integrated the spirit of our winning design entry with this newly generated data. Therefore, even if the plan is realized over decades with multiple leaderships, the end result will exhibit a cohesive design.
 With the plan in place, we then proceeded to make reality of the first phase of needed ex- pansion. The resultant new facility included space for additional classrooms, youth wor- ship, fellowship and physical fitness.
 Seen here is the main entrance to the facility with covered drop off and que space. Resting atop the canopies are the expansive windows of the Teen Worship space to the left and the Children's Worship space to the right. These were carefully designed and oriented to frame views to the mountains beyond
Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
Due to budget/fund raising constraints, not all of the identified needs were able to be incorporated into phase one. However, with a master plan in place that provides a listing of priorities and ideal locations for each, mov- ing forward with con- sensus is still possible.
 Here, due to the dire need for additional parking, the site to the rear of the sanctuary was chosen. This site also coincided with the desired location of the highest priority space needs. This decision immediately confronted us with two design challenges: creating an appropriate "back door" entrance to the campus; and linking that entrance to the existing sanctuary. We chose to use the two required youth worship spaces in conjunction with a uniquely designed drop off canopy to create this new, monumental entrance to meet the first challenge. And we chose to use the new conn- ection to the existing campus to complete the framing of a new courtyard created.
 Also seen in this image is the site of future expansion to the far left.

 

Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
This elevation photo shows the composition of individual forms to create a balanced whole. The series of square windows place high on the walls is used in this balancing act in addition to providing natural light to the gymnasium.

 

Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
Here, another elevation photo shows the composition of the new structure with the existing sanctuary. The design intent is to present a new structure that is of the original, not a copy. Familiar elements are borrowed in the new structure: the colonnade, circular windows, brick detailing, brick colors and roof material/color are all redistributed in a contemporary way.

 

Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
Here, in the new courtyard created between the existing sanctuary and the new facility, a safe, secure outdoor space was created in connection with the new classrooms.

 

Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
In addition to the architectural design team, TFBC worked with a "branding/image" de- sign team to uniquely identify their youth ministry program. We then collaborated with this team for the interior design and construction of the associated spaces. The result is a vibrant yet comfortable atmosphere that creates a "place of their own."
Here we see a com- fortable gathering space with a stage for informal presentations/ perform- ances. This space is connected to a cafe.

 

Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
Here in the Teen Worship space we see the high tech audio visual and theatrical lighting that has become synonymous with the con- temporary worship service.
Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
The fitness center included: two full size basketball courts, a walking/jogging track, a weight room, an aerobics room and locker/shower facilities.
Seen here in the gym are the track and basketball courts. The track was suspended from the roof structure above to take advantage of underutilized space.

 

Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
This image from the original design concept shows that it remained largely intact through design. There were (and always is) some modifications, however. The roof form of the Teen Worship space was re-designed to fit better within the surrounding context.

 

Client: Taylors First Baptist Church
Location: Greenville, SC
Scope: 45,500 sf New Family Life and Educational Center
Completion Date: 2005
Cost: $10 million
This image is from a series of renderings done during the master planning design effort showing “what could be”. Although, the expansion to the rear of the sanctuary appears different here, the essential spirit remains. The new construction shown in the foreground is a planned new fellowship hall.

 